核驰电器2020年度 价格体系 | ||||||||||||
The Company the | ||||||||||||
客户名称: | 报价日期: | 2020/7/01 | ||||||||||
客户地址: | 有效期限: | 90天 | ||||||||||
客户电话: | 报价人: | 广东核驰电器科技有限公司 | ||||||||||
名称 | 型号 | 颜色 | 蒸汽压力规格 | 电压参数 | 功率参数 | 营销说明 | 产品尺寸CM | 机器净重KG | 终端零售价 | 汽保经销价 | 代理出厂价 | 备注 |
大功率 蒸汽清洗机 | F6 | 蓝 | 2.0Mpa/约20公斤 | 380V | 8KW-16KW | 380V款 | 43*32*88 | 35 | 9980 | |||
蒸汽 清洗机 | F7 | 橙 | 1.2Mpa/约12公斤 | 220V | 6KW-12KW | 市电款 | 39*28*85 | 26 | 7980 | |||
商用 蒸汽清洗机 | F8 | 黑 | 2.6Mpa/约28公斤 | 380V | 12KW-20KW | 商用款 | 55*42*96 | 59 | 29800 | |||
工业 蒸汽清洗机 | F9 | 黑 | 3.0Mpa/约36公斤 | 380V | 12KW-26KW | 工业款 | 55*42*96 | 60 | 69800 | |||
备注: | 1 | 本次报价有效期为90天,逾期请复询; | ||||||||||
2 | 以上报价,如需开具发票,请传开票资料信息到我司账务。 | |||||||||||
3 | 产品保修一年 | |||||||||||
4 | 产品价格会根据物料成本会有所调整,如有调整,公司会以正式盖章文件另行通知! | |||||||||||
5 | 出口订单,可提供各国检测报告,需客户下单数量有一定要求! | |||||||||||
6 | 交货期:100台以上需要与我司协商沟通。 | |||||||||||
7 | 客户下订生产前需要,(另:核驰电器指定汇款账号表格。) | |||||||||||
8 | 机器附带配件:纸箱包装、泡沫上下两层。 | |||||||||||
9 | ||||||||||||
10 | ||||||||||||
广东核驰电器科技有限公司 | ||||||||||||
Guangdong HECHI Electrical ApplianceTechnology Co., Ltd. | ||||||||||||
Ronggui town, shunde district, foshancity, guangdong province, China flat kau xinghua east road no.32 地址:广东-佛山-顺德-容桂-扁滘-兴华东路32号-核驰电器大楼 | ||||||||||||
tell:0757-29899279; 24 hours servicehotline: 400-167-0608 |
Instructionmanual for steam cleaning
Intelligent frequency conversionsteam cleaning machine for nuclear galloping heat
Guangdong Nuclear ElectricTechnology Co., Ltd.
Guangdong HECHI ElectricalAppliance Technology Co.,Ltd.
No .32 Hing Wah East Road, Ping Kau, Rong Gui Zhen, ShundeDistrict, Foshan City, Guangdong Province
0757-29899279
0757-29899276
24-hour hotline :4008217693
Official website:www.fochiee.com
一、 Overview
1. Functiondescription
The steam cleaning machine usesthe heating pipe as the heat source to heat the water, and thepressurized water pump is used to pressurize the water, so as torealize the purpose of the high temperature and high pressure ofthe effluent and thus the cleaning activity.
Installationsteps
1. use a wrench toinstall the gun head in the steam pipe, then the steam pipecorresponding to the installation of the machine steam outletjoint, with the wrench tight.
2. install the intakepipe to the inlet of the fuselage, tighten it by hand, turn on thefaucet to let the water flow through, there is a water tank insidethe machine, and the water level reaches the set water level linewill automatically close the inlet (if the long shutdown does notneed to close the tap water source).
The3. power cord is connected to the power supply according to themarking on the line, the L is the fire line, the N is the zeroline, is the ground line, the fire line does not distinguish thecolor successively, may connect at will. Note: The air switch needs63 A, the power cord needs 6㎡, otherwise it will affect the currentand cause the line to overheat and catch fire! )
After 4. the power isconnected, the switch on the back of the machine is put on, and thehandle of the steam gun is kept by hand until the steam is out, andthe steam can be used normally after saturation.(Note: There willbe a small amount of hot water flowing out before steam, the muzzleshould be careful not to the human body direction, avoid scald!)
If the 5. machine isnot used for a long time, it is necessary to turn off the switchingpower supply and turn off the water source, and put the water fromthe sewage outlet out.
:: Note:
The machine must release all thesteam inside the gun pipe without using it at every stop to ensurethe service life of the steam pipe.